Sunday, December 7, 2008

THE STUDIO: Part Two-B: DURING CONSTRUCTION


There was a considerable 20 foot long gap between the "shed" roof and the older main room's roof that I filled by adding plywood, and then backing it with foam and a layer of batt fiberglass insulation. This had to be done slowly in 2 foot increments because I had to reach behind each section of plywood in order to push the foam and then the fiberglass against the plywood. Note the corregated steel at the bottom of the photo? The entire middle room is covered with the stuff. Made for challenging methods of nailing and screwing to it.